Spare Parts And High Demand Cnc Machining Parts Service

Inquire Now

Description:

1. Support Materials

Stainless Steel

SS201,SS301,SS303, SS304, SS316, SS416 etc.

Steel

Mild Steel, Carbon Steel, 4140, 4340, Q235, Q345B, 20#, 45#, DC01, SPCC, SPHC, CGCC etc.

Brass

HPb63, HPb62, HPb61, HPb59, H59, H68, H80, H90, C36000 etc.

Copper

C11000, C12000, T1, T2, T3 etc.

Aluminum

AL1100, AL1050, AL1070, AL1060, AL2014, AL2017, AL2024, AL3003, AL5052, AL5754, AL6061, Al6063, AL6082, AL7075, LY12, LY11, 2A12  etc.

Iron

A36, 1213, 12L14, 1215 etc.

2. Surface Treatment

Stainless Steel

Polishing, Passivating, Sandblasting, Electrophoresis, PaintingPowder Coated

Steel

Zinc Plating, Oxide Black, Nickel Plating, Chrome Plating, Carburized, Powder CoatedElectrophoresis,Painting

Aluminum

Clear Anodized, Color Anodized, Sandblasted Anodized, Chemical Film,Brushing,Polishing

3. Application

Bike

Automobile Industry

Computer Equipment

Agricultural Equipment

Textile Equipment

Miscellaneous Equipment

Measuring Instruments

Medical/Dental Instruments

Safety Equipment

Petrochemical Industry

Pumps Connections

Pharmaceutical Industry

General Machinery

Pharmaceutical Industry

Fixing Equipment

Industrial Valves

Sanitary Fittings

Instrumentation Equipment

Food Beverage Processing

Orthopedic Implants

 

Thickness

0.1mm to 12mm, as your request

Sizes

1) According to customers drawings
2) According to customers samples

Surface treatment

zinc, nickle, chrome plating, powder coating, painting, etc.

Packing

Polybag+Carton box+Wooden case/Pallet, according to customers request

 

 

Shipment

1) By courier, like DHL, TNT, Fedex, etc, usually 5-7 days to arrive

2) By air to air port, usually, 3-4 days to arrive

3) By Sea port, usually 15-30 days to arrive

Delivery Time

depend on the quantities, usually around 10 days.

Payment Term

T/T, L/C

Certification

ISO

Logo service

provided

Application

widely used on construction, industry.